Skip to main content
Email: info.anumati@wb.gov.in | Accessibility:
Font Size:

Ground Based Tower/PCoW Details


Ground Based Tower/PCoW

A ground-based mobile tower installed on land/public property for carrying, supporting, or suspending a telecommunication network, including associated supporting infrastructure such as BTS, power/back-up equipment, and transmission/backhaul arrangements. It falls under overground telecommunication network and is treated as a mobile tower/above-ground contrivance, excluding poles.


Necessary details for application submission

  • General Information
  • Latitude
  • Longitude
  • Nearby Buildings (within 200m)
  • Nearby Electrical Lines (within 200m)
  • Location Address
  • Other/Temporary Structures on Land
  • Any Obstacles/Structures on land
  • Covered Area (in Sqft)
  • Open Area (in Sqft)
  • Tower Area (in sqft)
  • Execution timeline (No. of days)
  • Land Type
  • Funding Source
  • Any Structural change
  • If Structural Change is Yes
  • Damage Details
  • Restoration Amount (in thousands)
  • If Structural Change is No
  • Proposed Tower Height (in meters)

Files to be Uploaded

  • A copy of the license/ registration/ Exemption certificate granted by the Department of Telecommunication Govt of India (PDF)
  • Details of the ownership and use of land and location map (PDF)
  • Technical Drawing for Tower and Foundations or other above-ground contrivances OR other specific details (PDF)
  • Copy of SACFA Clearance (PDF)
  • Undertaking to take care of loss or injury to accident caused during Execution (PDF)
  • Undertaking for the damage to the property caused to the infrastructure claims (PDF)
  • Layout Plan / Site Plan (PDF)
  • Photograph of land (PDF)
  • Technical Note/ Justification of the necessity of the proposed infrastructure (PDF)
  • Structural stability certificate for Building from State Government authorized Structural Engineer (PDF)
  • Soil Bearing Test Report (PDF)
  • Foundation design certificate from Authorised Structural Engineer (PDF)
  • Lease agreement deed, NOC/ Consent Letter by Land owner (PDF)
  • Undertaking for Public Inconvenience and Mitigation Measures (PDF)
  • Technical Drawing for Tower and Foundations (PDF)
  • Structural Stability Certificate for Tower including Foundation (PDF)
  • Undertaking by Applicant (PDF)